Skip to main content

civilraw.in

CivilRaw AI – Your Pocket Engineer

CivilRaw AI logo with an amber column supporting a house frame

YOUR POCKET ENGINEER · Built for individual homeowners and site builders

Stop guessing contractor bills. Check the work and estimate what you need.

CivilRaw AI helps you document visible site issues, calculate material quantities, and understand the rates behind a contractor’s quote.

How it works · App features · IS Standards · FAQ

How it works

Inspect

Capture what you see, where it is, and when it appeared.

Measure

Use site dimensions and product coverage to check material quantities.

Compare

Review quantities, material and labour rates, and approved extras before payment.

Sample site audit

Illustrative concrete column with visible honeycombing

Visible honeycombing on a concrete column

The sample shows how a visible observation can be documented for engineer review. Add the column location, date, and photos from more than one angle. Structural safety and repairs require a qualified engineer’s assessment.

Sample cost estimate for a 12 × 15 ft room

For 180 sq.ft of 2 × 4 ft vitrified flooring, assume two tiles per box, 10% additional tile allowance, and 50 sq.ft coverage per adhesive bag. Confirm product coverage with your supplier.

Materials · ₹14,030

  • 13 tile boxes × ₹950
  • 4 adhesive bags × ₹420

Labour · ₹3,420

180 sq.ft × ₹19 per sq.ft

Estimated total ₹17,450 using illustrative rates, before taxes and delivery.

What’s inside CivilRaw AI

The interactive preview includes a sample photo auditor, room estimates for interior painting and flooring, and WhatsApp and print-to-PDF sharing.

Planned app tools

  • Ask CivilRaw AI in English or Telugu about site work, drawings, and materials.
  • Stage-wise quality checks for footings, columns, slabs, masonry, waterproofing and finishes.
  • Activity quantities and full-home BOQ covering individual activities and stage-wise G+1 estimates.
  • Contractor bill review using measured quantities, agreed rates, and approved extras.
  • Local rate comparison for materials and labour, with source and date where available.
  • Engineer requests for site inspections, BOQ reviews and bill verification.

Engineering references

The methodology references IS 456 for reinforced concrete, the IS 1200 series for measurement of building works, and IS 13920 for ductile detailing.

Frequently asked questions

Does the sample audit analyse my photo?

The preview demonstrates photo documentation using sample images. Live photo analysis is planned.

Are the prices live market rates?

The figures shown are sample rates. You can enter your own supplier and labour quotes in the interactive preview.

Can I request help with a project in Hyderabad?

Yes. Contact CivilRaw for a site inspection, BOQ review or contractor bill verification.

WhatsApp Us
Call Now